Connect Waste Cube, Solid-Phase Synthesis - Heidolph SYNTHESIS 1 Instrucciones De Empleo

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

E
2.5

Connect waste cube, solid-phase synthesis

PTFE tube protrudes over clamp ring by 20 mm
tube fitting
clamp ring
Use PTFE hose (1/16") coming with the item to connect vessel base with waste
cube. Make sure not to connect items with different identification markings.
Install union ring and clamping ring on waste cube as shown.
Protruding length allows filtrate to be routed to its particular collecting vessel.
77
Tabla de contenido
loading

Tabla de contenido