Installation Steps; Installation Procedure - Toto EcoPower TS626KG Manual De Instrucciones Y Del Propietario

Ducha de lluvia led
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation steps:

1) Build supporting frame
Step 1
2) Install mounting brackets
Step 2
and safety chain anchor
3) Install showerhead plate
Step 3
4) Connect supply hose
(not included) to showerhead
Step 4
and safety chain
5) Install showerhead
Step 5
1) Build supporting frame
Build supporting 2x4 frame
(not included) and secure it
between existing ceiling joists
NOTE: The bottom of the
support frame should be flush
with the bottom of the ceiling
joists after installation.

INSTALLATION PROCEDURE

Step 1
Step 2
Step 3
Step 4
Step 5
Step 5
4
OR
existing ceiling frame
existing ceiling frame
customer prepared 2x4 frame
customer prepared 2x4
existing ceiling frame
existing ceiling frame
frame
Tabla de contenido
loading

Este manual también es adecuado para:

Ecopower ts624kg

Tabla de contenido