Mounting The Power Unit - NuTone PUREPOWER Serie Manual De Instalación

Ocultar thumbs Ver también para PUREPOWER Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

POWER UNIT INSTALLATION (

MOUNTING THE POWER UNIT

Carefully remove debris pail from power unit. Make sure bag
is properly installed in power unit (if need be). Remove the
installation kit and securely reinstall debris pail.
Refer to illustration below to maintain minimum walls and
floor clearance dimensions.
MINIMUM CLEARANCE DIMENSIONS
TOP VIEW
12"
minimum
12" minimum
from ceiling
18" minimum
above floor
AD0039A
Position and install the wall mounting bracket with the
provided screws. Refer to illustration at right for proper
mounting dimensions.
CAUTION
Ensure to screw the wall mounting bracket directly
to a wall stud for a solid installation.
12"
minimum
FRONT VIEW
28
'
)
CONT
D
18 ¹/
"
8
UPPER
MOUNTING
HOLES
LOWER
MOUNTING
1" TYP.
HOLES
AD0079A
Use the provided mounting screws to secure the mounting
bracket on the wall through upper and lower mounting
holes.
Hang power unit onto wall mounting bracket. Ensure
the back brackets of the power unit are engaged with
corresponding wall bracket fingers (or top fingers and lower
tab for PP500 model; see figure below). Pull the power unit
down to secure
PP600 & PP650
AD0074
C L
18 ¹/
"
8
3/4" TYP.
45¼"
MIN.
HEIGHT
32
7
/
"
8
PP500

Capítulos

Tabla de contenido
loading

Tabla de contenido