6.
Technical Specifications
Nominal diameter:
Minimum flow pressure:
Recommended flow pressure:
Maximum operating pressure:
Calculation flow rate:
FAR-Order-No.: 0004 67 56
FAR-Order-No.: 0005 28 56
7.
Scope of Delivery
Quantity
1
1
1
8.
Dimensions
9.
Installation Example
10. Assembly Instructions
10.1 Screw-in the G½B connection spigot leak-tight using an open-jaw wrench.
10.2 Slide the shower head onto the connection spigot.
10.3 Screw-in the grub screw using a hollow hexagon wrench.
11. Adjusting the Angle
11.1 Use a face spanner to loosen the retaining ring.
11.2 Adjust the desired shower range.
11.3 Use a face spanner to tighten the retaining ring.
Description
Jet shower head München
Connection spigot
Installation and Operating Instructions
DN 15
1.0 bar
1–5 bar
10 bar
0.15 l/s or 0.20 l/s
9 l/min (0.15 l/s) at and above 1.0 bar flow
pressure
12 l/min (0.20 l/s) at and above 1.0 bar flow
pressure
5