Installing The Water Line - GE CUSTOMSTYLE 162D9625P003 Manual Del Propietário

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installing the water line.

Read these instructions completely and carefully.
Installing the Water Line
Install the Shutoff Valve
Prepare to install the shutoff valve on the nearest
1
frequently used drinking water line.
Shut off the main water supply. Then turn on an
2
appropriate faucet to release pressure in the
chosen pipe.
Choose a location for the valve that is easily
3
accessible. It is best to connect into the side of a
vertical water pipe. When it is necessary to
connect into a horizontal water pipe, make the
connection to the top or side, rather than at the
bottom, to avoid drawing off any sediment from
the water pipe.
Drill a 1/4" hole in the water pipe, using a sharp
4
bit. Remove any burrs resulting from drilling the
hole in the pipe.
Route the Copper Tubing and Connect It to the Shutoff Valve
Route the copper tubing between the cold water
line and the refrigerator.
If necessary, drill a hole in the wall or floor (behind
the refrigerator or adjacent base cabinet) as close to
the wall as possible.
Be sure there is sufficient extra tubing [about 8
feet (244 cm) coiled into 3 turns of about 10 "
(25 cm) diameter] to allow the refrigerator to
move out from the wall after installation.
Turn On the Water and Flush Out the Tubing
Turn the main water supply on and flush out the
1
tubing until the water is clear.
20
Fasten the shutoff valve to the cold water pipe
5
with the pipe clamp.
Tighten the clamp screws until the sealing
6
washer begins to swell.
Do not overtighten or you may crush the pipe or
damage the tubing.
Washer
Pipe Clamp
Saddle-Type
Shutoff Valve
Place the compression nut and ferrule (sleeve)
onto the end of the tubing and connect it to the
shutoff valve.
Make sure the tubing is fully inserted into the valve.
Tighten the compression nut securely.
Also check if the shutoff valve is closed before
advancing to the next step.
Shutoff Valve
Packing Nut
Outlet Valve
Shut the water off at the shutoff valve after at
2
least one quart (1 L) of water has been flushed
through the tubing.
Inlet End
Vertical Cold Water Pipe
Compression Nut
Ferrule (sleeve)
Tabla de contenido
loading

Tabla de contenido