Commissioning
6.5 Connecting the LED strip to a building automation system
A building automation system with a 24 V DC output can be used instead of a LIRPROTEC
power pack (see Fig. G).
Details on connecting to the building automation system can be found in the associated
documentation for the external components.
7
Commissioning
Proceed as follows to commission the LIPROTEC system:
Make sure that all components are mounted and connected correctly.
Plug the power pack's mains plug into a professionally earthed protective contact
socket (230 V, 50 Hz).
Make sure that all of the LED strips light up.
If you use a Bluetooth receiver, you can now call up the pre-programmed settings
with the remote control. For more information, read the chapter entitled
"Commissioning" in the directions for use for the Bluetooth receiver.
Make sure that the LIPROTEC system is working in principle.
Connect all cable channels and panelling.
Your LIPROTEC system is now ready for daily use!
8
Operation
The LED strip does not having control or switch elements.
If you have switched a receiver between the power pack and LED strip, read the operating
instructions of the receiver.
9
Maintenance
Dirt must be cleaned off the LED strip if no spreading discs are used. No parts that have to
be maintained or exchanged are used.
To clean the LED strip, proceed as follows:
Switch off the LIPROTEC system.
Wipe contamination off the LED strip with a dry, non-linting, soft cloth.
10 Elimination of faults
Fault
Cause of fault
No lighting
Connections mixed up
34
Remedy
Check that all of the cable connections are
connected properly.
Directions for use for LED strips