Tower Installation; Setup The Ups - lapara LA-ON-1K-LCD-V.10 Manual De Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Tower Installation

Step 1

2-4. Setup the UPS

Before installing the UPS, please read below to select proper location to install UPS.
1. UPS should be placed on the flat and clean surface. Place it in an area away from vibration,
dust, humidity, high temperature, flammable liquids, gases, corrosive and conductive
contaminants. Install the UPS indoors in a clean environment, where it is away from
window and door. Maintain minimum clearance of 100mm in the bottom of the UPS to
avoid dust and high temperature.
2. Maintain an ambient temperature range of 0ºC to 45ºC for UPS optimal operation. For
every 5ºC above 45ºC, the UPS will derate 12% of nominal capacity at full load. The
highest working temperature requirement for UPS operation is 50ºC.
3. It's required to maintain maximum altitude of 1000m to keep UPS normal operation at full
load UPS. If it's used in high altitude area, please reduce connected load. Altitude derating
power with connected loads for UPS normal operation is listed as below:
4. Place UPS:
It's equipped with fan for cooling. Therefore, place the UPS in a
well-ventilated area. It's required to maintain minimum clearance of 100mm
front of the UPS and 300mm in the back and two sides of the UPS for heat dissipation and
easy-maintenance.
5. Connect to External Battery Pack
LA-ON-1K/2K/3K-LCD/RACK-V.10 (2018)
Step 2
6
Step 3
in the

Capítulos

Tabla de contenido
loading

Tabla de contenido