Step 2
Fitting Additional Top Stops
TOOLS REQUIRED
ADJUSTABLE WRENCH/PLIERS
Opened Requirements
68°- 80°
PARTS REQUIRED
C1. (2) M4 X 8MM TOP STOP BOLTS
C2. (2) ADDITIONAL TOP STOPS
C3. (2) M4 LOCKING NUTS
Figure C
Floor to
floor height
Depending on the floor to floor height (see Opened Requirements
left), you may need to add the additional top stops provided (C2)
(see table below).
1. If required, locate the additional top stops over the holes
2.
3.
Operating Heights
Feet & Inches
7' 0" to 7' 6"
7' 6" to 7' 11"
7' 11" to 8' 5"
8' 5" to 8' 10-1/2"
8' 10-1/2" to 9' 4"
9' 4" to 9' 10"
Permanent top stop
B2
B1
approximately 6" below the permanent top stops on the rear
section of the ladder (See Figure C).
Ensure the hinge guides (B1 & B2) are already in place and
below the additional top stops when assembled.
Fix the additional top stops using two M4 bolts and nuts
supplied (C1 & C3).
Top Stops Required
YES
NO
YES
NO
YES
NO
C1
C2
C3
C1
C2
C3
4