SKYLOTEC D-BOLT AP-058 Instrucciones De Uso página 25

Ocultar thumbs Ver también para D-BOLT AP-058:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74
5.1 Installation instructions for Skylotec D-Bolt AP-058; AP-063-GE
and AP-063-GPS anchor point using Würth injection system W-VIZ/A4 M16 (h
Pay attention to fixing installation instructions and approval (ETA-04/0095).
1
Using a hammer drill, create a bore hole with a drill nominal diameter of d
bore hole depth of h
2
Clean the bore hole (blow out 2x oilfree, brush out 2x, blow out 2x oilfree).
3
Attach the mixer to the cartridge using the dispenser gun.
4
Before use, dispense a strand of around 10 cm but do not inject it into the bore hole.
Checking the temperature of the anchor base: The temperature must be ≥ +5°C. Starting
5
from the base of the bore hole, fill the hole with injection adhesive. About 2/3 of the bore
hole has to be filled with injection adhesive.
6
Push in the anchor rod with a slight turning movement down to the bore hole base.
Visually check the amount of adhesive or setting depth marking respectively. The adhesive
7
has to reach the surface. If no adhesive is visible at the surface, the anchor rod must be
removed immediately and WIT-VM 100 injection adhesive injected again.
Comply with the curing time of the injection adhesive. Processing is possible only from a
8
temperature of ≥ +5°C. See the processing notes on the cartridge and the installation
instructions.
9
Install AP-063-GE or AP-063-GPS, do not exceed max. torque of 50 Nm.
MAT-MA-0005-EN_D-BOLT
≥ 130 mm vertically to the surface of the anchor base.
1
09/06/2017
125)
ef
=18 mm and
o
Page 6 of 18
Tabla de contenido
loading

Este manual también es adecuado para:

Ap-063-geAp-063-gps

Tabla de contenido