Preparing The Sprayer - WAGNER Paint Crew Plus Manual Del Usario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

All new units are performance-tested at the factory and are shipped with test fluid in the fluid section to prevent corrosion
during shipment and storage. If you have already used your pump, some water or solvent used in cleaning may remain
in the fluid section. Whether your sprayer is new or if you have already used it, this fluid must be purged and thoroughly
cleaned out of the system prior to use. Follow the steps below.
1. Remove the hopper. Insert the inlet pusher tool (a)
into the center of the inlet valve area (b). Push pusher
tool down to ensure proper operation of the inlet valve.
Replace the hopper.
(a)
3. Turn the PRIME/SPRAY knob to
PRIME.
Plug in the sprayer.
Turn the ON/OFF switch to ON (l).
Any fluids remaining in the pump and
the return tube will flow out of the
return tube. Let the pump run until no
fluid is coming from the return tube.
6. Switch your unit ON once more and make sure that
material is flowing from the return tube (f). Turn pump
OFF and replace the hopper lid.
(f)
English

Preparing the Sprayer

(b)
4. Switch the pump to OFF. Remove
the return tube from the waste
container and insert it into the
notch in the hopper lid (d).
(d)
8
2. Pull the return tube (c) from the hopper and hold it over
a waste container.
(c)
5. Remove hopper lid. Fill your
hopper with the material you plan
to spray. Do not exceed 2 1/2
gallons (e).
If spray material does not flow from the return tube, the
inlet valve may be stuck. Follow these steps.
1. Shut the unit OFF and unplug.
2. Carefully remove and empty the hopper. Clean the
connecting areas on the hopper and the unit.
3. Insert the inlet pusher tool (a) into the center of the inlet
valve area (b). This should release the inlet valve and
allow spraying material to flow through the return tube.
4. Replace hopper and return tube and resume.
(a)
(e)
(b)

Capítulos

Tabla de contenido
loading

Tabla de contenido