John Bean B 1200P Manual De Operador página 132

Tabla de contenido
A
1
2
3
132
B
C
6-7
Maintenance
6.3
Monitor Calibrating
Follow the fi gures 6.7 (1, 2, 3).
Keeping the STOP key pressed for more than 3
seconds in the Introduction screen the calibration
process starts. The process is performed in 3 stages.
The operator must touch in three different times the
white dot with the cross indicator shown on the screen.
First stage;
• Touch the top left dot (A).
Second stage;
• Touch the middle right dot (B).
Third stage;
• Touch the centre bottom dot (C).
At the end of the calibration process, the machine
restarts automatically.
The Touch Screen is now operational.
Tabla de contenido
loading

Tabla de contenido