Panasonic TY-VK55LV1 Instrucciones De Montaje página 29

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 65
6. Mounting multiple units
① Insert the pins into the holes in the
adjacent installation mount.
② Fasten the adjacent frames together using
the frame linking screws, nuts, fl at washers
and spring washers Ⓒ.
(Tightening torque: 3.5 to 4.5 N·m)
③ Now repeat ① and ② to interlink the other
units.
* When mounting multiple units, see below
for the order in which the units should be
mounted.
④ If necessary, fasten to the mount surfaces
of the respective installation mounts.
Ⓒ Frame linking screws
fl at washers and spring washers
nuts
Example of order for mounting multiple units: When interlinking 6 units
① Mount the unit that will serve as the base position (
② Successively mount the units in a row to the right of the base position unit (
③ Mount the unit above the base position unit (
④ Successively mount the units in the row to the right of unit
4
   
Base position
1
Pins
).
1
).
4
5
6
2
3
and
2
(
and
).
4
5
6
).
3
29
Tabla de contenido
loading

Este manual también es adecuado para:

Ty-vk47lv1

Tabla de contenido