Winkhaus blueMatic EAV4 Guía De Instalación Rápida página 56

Idiomas disponibles
  • ES

Idiomas disponibles

Quick installation guide
EN
3 Installation
3.1 Routing details
3
Routing for a standard triple-point lock are required to install the blueMatic
EAV4 / EAV4+ locking system. In addition, routings for the motor housing are
required as indicated in the following diagrams.
Aug. Winkhaus GmbH & Co. KG ∙ Berkeser Straße 6 ∙ 98617 Meiningen
T +49  369  3950 - 0 ∙ www.winkhaus.com ∙ Subject to technical changes
blueMatic EAV4 / EAV4+
Notice: After the door elements have been installed, an initial
functional check should be carried out on site in the presence of
the client or his representative and a visual / functional
acceptance report should be created.
The cables included in the scope of services should be laid at
this point in time to the intended transfer point (e.g. junction
box). They should be protected from damage and from other
trades (plaster, drywall, ...) for the subsequent construction
period.
Loose / bundled cables hanging freely should be avoided.
14
5095553
loading

Productos relacionados para Winkhaus blueMatic EAV4

Este manual también es adecuado para:

Bluematic eav4+