Waeco PerfectView M59L Instrucciones De Montaje página 49

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 82
_M59L_EB_10s.book Seite 49 Dienstag, 22. Januar 2008 4:59 16
PerfectView
Creating a through-hole for the monitor connection cable (fig. k,
page 9)
I
Note
Where possible, use available openings, such as ventilation grilles,
panel edges or blank panels to feed the connection cables through.
If there are no existing openings, you must drill a hole with a 13 mm
diameter. Check beforehand that there is sufficient room for the drill
head to come out on the other side.
➤ Drill a hole of Ø 13 mm near the monitor.
➤ Deburr all drill holes that have been made in the sheet metal and apply
rust-protection.
➤ Place cable sleeves in all sharp-edged ducts.
Connecting the monitor to the voltage supply
The circuit diagram for the LCD monitor can be found in fig. l, page 10.
No. in fig. l,
page 10
1
2
3
4
5
6
7
8
15
31
The following abbreviations for the colour coding of the connection cables
are used:
br
brown
yellow
Description
Control box
Switch for the vehicle light
Switch for the reversing light
Ignition socket
Branch connector or soldering point
Indicator
Instrument illumination
Reversing light
Terminal 15 (connected positive terminal)
Terminal 31 (earth)
ge
or
orange
Installing the LCD monitor
rt
sw
red
black
ws
white
49
Tabla de contenido
loading

Tabla de contenido