Section 4: Operation
OPERATmNG
THE
See "Don't
Overload
Generator",
Start generator
and let engine stabilize before connecting
electrical
loads.
Connect
electrical
loads in OFF position, then turn ON for
operation.
Turn electrical
loads OFF and disconnect
from generator
before stopping generaton
[HPORTANT:
Always unplug the battery float charger
before starring the generator.
Starting
the Engine
Disconnect
ai[ electrical loads from the generator. Use the
following
start instructions:
i,
Hake sure unit is on a level surface.
IMPORTANT:
Failure to start and operate unit on a level
surface wiil cause the unit not to start or to shut down
during operation.
2.
Turn the fuel valve to the "On"
position (Figure 5).The
fuel valve handle should be vertical (pointing toward
the ground) for fuel to flow,
in the On position
3.
Start engine according to instructions
given in the
engine owner's manual
1
WAR.I.G
1
When starting
engine, pull cord slowly until resistance is felt
and then pull rapidIy to avoid kickback.
NEVER start or stop engine with electrical
devices plugged in
and turned on.
NOTE:
If engine starts after 3 pulis but fails to run, or if
unit shuts down during operation,
make sure unit is on a
level surface and check for proper oil level in crankcase.
This unit may be equipped with a low oil protection
device.
See engine manual.
WANNING
DO NOT touch hot surfaces.
Allow equipment
to cool before touching.
The generator
must be at least 5 feet from structures
having
combustible
walls and/or other combustible
materials.
Keep at least 3 feet of clearance on all sides of generator
for
adequate cooling, maintenance
and servicing.
in the S_ate of California
a spark attester
is required by law
(Section 4442 of the California
Public Resources Code). Other
states may have similar laws. Federal laws apply on federal
lands, if you equip the muffler with a spark arresten it must be
maintained
in effective working
order:
Cormecting
Electrical
Loads
° Let engine stabilize and warm up for a few minutes after
starting.
° Plug in and turn on the desired 120 and/or 240VoitAC_
single phase_60 Hz electrical
loads.
* DO NOT connect 240Volt
loads to the i20Voit
duplex
receptacles.
° DO NOT connect 3-phase loads to the generator.
° DO NOT connect 50 Hz loads to the generator.
* DO NOT
OVERLOADTHE
GENEPJ:kTOR.
See
"Don't
Overload
the Generator".
the
Ens:ine
I.
Turn OFF and unplug ali electrical loads from
generator
panel receptacles, NEVER s_rt or stop engine
with electrical devices plugged in and turned ON,
2,
Let engine run at no-load for several minutes to
stabilize internal temperatures
of engine and generator.
3,
Turn engine off according to instructions
given in the
engine owner's manual,
4.
Hove fuel valve to "Off"
position.
loading