universalblue UVT1376-24 Manual De Instrucciones página 34

Ventilador de techo
Idiomas disponibles

Idiomas disponibles

ENGLISH
using the appropriate screws. Make
sure it is well fixed. Warning: the
screws supplied are designed to be
used on wooden beams and concrete
ceilings. (Pic. 1)
• You must loosen the two screws on the
bottom part so that the top cover can be
assembled.
Fan body:
• First loosen the two screws located on
the top part of the fan body, where the
downrod is going to be inserted.
• Remove the safety pin from the
downrod and save it. (Pic. 2)
• Then follow this sequence: Insert the
down rod through: the top cover and the
bottom cover (pic. 3)
• Introduce the cables through the down
rod too (Pic. 4)
• If you were unable to thread the cables
through the downrod we suggest that
you remove the hemisphere located on
top of the downrod (pic. 5), proceed as
follows:
• Remove the upper screws located
on the rubber hemisphere and save
them. Keep in mind that one of them
will hold the earth wire extension
cable (pic. 5.3) Remove the safety pin
and save it together with the screws
(pic. 5.2 and 5.1) Then thread the
cables and fix it again.
• To fix the hemisphere again: Insert
the safety pin in the holes on the top
part of the down rod (pic. 5.1) Then
bring up the rubber hemisphere until
all the holes are aligned (pic. 5.2)
Last, fix it with the screws you have
removed earlier and fix the earth
wire with one of them (pic 5.3)
• Once you have inserted the cables,
Fit the rod in the motor housing and
insert again the safety pin previously
removed. Then, tighten the screws of
the motor housing which have been
loosened before (pic. 6)
• Once you have finished, adjust the
bottom cover and hide the connection
between the down rod and the motor
34
housing. (Pic. 7)
Electrical connections:
• Put the fan on the ceiling bracket
by introducing the down rod in the
receiver bracket and turn it until you
hear a "click" sound, insert the slot
located on the hemisphere of the down
rod, in the tab of the receiver bracket.
(pic. 8).
• Then we can proceed to do the pertinent
electrical connections. See image 06 on
page 9:
• First place the receiver between the
bracket and the fan, with the smooth
part facing upwards (pic. 9).
• Once placed, connect the cables
coming out of the ceiling using the
circuit board located on the receiver
support. Connect the phase wire to L
and the neutral wire to N.
• Then connect the cables coming
out of the ceiling bracket and the
fan body to the receiver wire inputs.
Connect the earth wires too (pic. 10).
• Once the electrical connections are
completed, slide the top cover up
and align the holes with the screws
you have previously loosened on the
receiver support. Turn it until it fits and
then tighten the screws. (Pics. 11 and 12)
How to assemble the light support
and/or the LED light plate:
Depending on the model purchased, the
light support and the LED light plate will
be installed in one of the following ways.
Refer to the drawings on page 8, Figure 13
(A) or Figure 13 (B) for the correct method:
Fig. 13.A
• Place the light support so that the holes
are aligned with the holes from the
motor and threading the cables coming
out from the motor through the centre
of the panel.
• Then fix the screws on the light support.
Please, make sure the lighting kit is
well fixed after you have tightened the
screws.
loading

Este manual también es adecuado para:

Uvt1377-24Uvt1378-24Uvt1379-24Uvt1380-24