LG PDI Premium PQNUD1S40 Manual Del Propietario Y De Instalación página 15

Aire acondicionado
Ocultar thumbs Ver también para PDI Premium PQNUD1S40:
Idiomas disponibles

Idiomas disponibles

Wiring
• Separate the power supply case.
• Loosen the clamp fixating the power supply.
• Connect the 220–240 V~ power cable to the black and grounding terminal.
• Connect the 24 V~ power cable to the yellow terminal.
• Use the clamp to fixate the 220–240 V~ and 24 V~ power cable.
• Use the screw to assemble the case.
• Use the included screws to fixate the power indicator and power supply at appropriate loca-
tions within the electric panel.
• Connect the 24 V~ power cable connected to the power supply to the power terminal of the
power indicator.
• Wire wattmeter, gas meter, central controlled communication cable, and the repeater for re-
mote reading.
Power connection
220–240 V~
Mounting on wall
WARNING
!
• Always tighten the terminal screws so that they do not become
loose.
• When connecting the power and communication cable,
always use the terminal (O-Ring, Y-Ring).
• For 220–240 V~ power cable, use (CV) 1.5 mm
power cable, use the CV wire.
CAUTION
!
• Power must be turned on after the product is wired completely.
• When power is removed and then applied again, power on after 2 minutes.
POWER
POWER
WHM
MENU
SELECT
PQNUD1S40
WHM CHECK
ODU
2
x 3 and for 24 V~
INSTALLATION METHOD
WHM
MENU
SELECT
PQNUD1S40
ODU
WHM CHECK
15
loading

Este manual también es adecuado para:

Pdi premium pqnud1s41