Alice's Garden SUP330AG15LCGGY Manual página 40

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
EN
2. Fin installation
Once the board is inflated, slide in the large Center Fin to the base and insert the fixed pin.
A
B
3. Operating Valve
Follow the instructions below for operating the Valve and the inflation and deflation procedures.
The board's inflation valve is located near the nose of the board.
40
1
3
2
C
Vlave diagram:
1. Valve cap
2. Pin
3. Valve base
30/10/2023
Tabla de contenido
loading

Este manual también es adecuado para:

Sup330ag15nsSup330ag15lcSup285ag10Sup360ag15nsSup300ag15ns

Tabla de contenido