Flotec FP450C Manual Del Usuario página 8

Add-a-jon equipo cloacal
Ocultar thumbs Ver también para FP450C:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation
12"
24-1/4"
Cut 3" hole with holesaw to run drain line
from an additional fixture into tank. Center
of hole must be at least 6-1/2" above bottom
of tank. Use grommet to seal pipe where it
runs into tank. Be sure to support pipe to
take its weight off side of tank.
5-3/8"
Figure 6: Add-a-Jon Dimensions.
Performance
Lift in Feet (m)
18 (5.5)
Gallons per Minute
0
For parts or assistance, call Flotec Customer Service at 1-800-365-6832
12-5/8"
3" NPT Spinweld
Vent Fitting
39-5/8"
Gallons of Water Pumped per Minute at Specified feet of Lift
14 (4.3)
12 (3.7)
35 (132)
47 (178)
14-1/2"
7-7/16"
Min. 6-1/2"
10 (3.1)
8 (2.4)
60 (227)
70 (265)
8
2-7/16"
19-1/4"
6 (1.8)
4 (1.2)
80 (303)
92 (348)
Tabla de contenido
loading

Tabla de contenido