Astralpool APH3 INVERBOOST 68837 Manual Del Usuario página 17

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 138
2.1 Delivery of the unit
For the transportation, the heat pump are fixed on the pallet and covered with a cardboard box.
To protect from any damage, the heat pump must be transferred in its package.
All material, Even if the transport is chargeable to supplier, can be damaged during its routing at the customer
and it is the responsibility of the addressee to make sure of the correspondence of the delivery.
The addressee has to written all the reserves at the reception on the delivery note of the carrier if he notices
damages of the packaging. DO NOT FORGET TO CONFIRM BY REGISTERED LETTER TO THE CARRIER UNDER 48
H.
2.2 Stock advice
* The warehouse should be bright, spacious, open, well ventilated, have ventilation equipment and no fire
source.
* Heat pumps must be stored and transferred in vertical position in its original packaging. If it is not the case, it
cannot be operated until a minimum period of 24H has passed before the unit can have the electrical power
turned on.
2.3 Transfer to the final position
* During the unpacking of the product and the transfer from the pallet to the final place of installation, it is
necessary to maintain the heat pump in a vertical position.
* Smoking and the use of flames are prohibited near R32machine.
* Water connection are not to be used as load bearing handles. The manufacturer would not take the
responsibility in case of damage to the water pipes.
2.
2.
Transport
Transport
information
information
2.
Transport
information
FORBIDDEN
- 13 -

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Aph3 inverboost 68838Aph3 inverboost 68839Aph3 inverboost 68840

Tabla de contenido