Kinetico 2020c Instrucciones De Instalación página 7

Ocultar thumbs Ver también para 2020c:
Idiomas disponibles

Idiomas disponibles

Procedure
11. Connect Brine Tank
Apply 2 – 3 wraps of Teflon
valve.
Locate ⅜" x tube elbow.
Hand tighten elbow.
Attach ⅜" tube from elbow to brine valve – hand tighten
tube side nuts.*
Make sure tubing is not kinked.
* Hand tighten then turn 1 ½ to 2 turns with a wrench.
13. Confirm Drain Air Gap
Waste connections or drain
outlets shall be designed
and constructed to provide
for connection to the
sanitary waste system
through an air gap of
2 pipe diameters or
25 mm, whichever is
larger.
15. Flush System
Flush both the inlet and outlet lines by opening the by-
pass valve and allowing water to rinse out any debris in
the lines.
Flush lines for 10 minutes.
®
tape to ⅜" nipple on control
12. Install Drain Line
Apply 2 – 3 wraps of Teflon
control valve.
Locate ½" x tube elbow.
Hand tighten elbow.
Attach ⅝" drain line from elbow to drain.*
Make sure line is not kinked.
Drain lines must not travel more than 2.4 meters up
from module head.
On lines traveling more than
10 meters, increase
diameter of the drain line.
* Hand tighten then
turn 1 ½ to 2 turns
with a wrench.
14. Install Brine Tank Overflow
Install a ½" or ⅝" (depending on drum) I.D. overflow line
on the barbed overflow fitting on the drum, and connect
it to a drain.
Make sure the drain is not higher than the barbed
fitting.
FOLLOW PLUMBING CODES.
16. Start-up System
Put by-pass into service position.
Using #2 Philips screwdriver,
depress and turn actuator clockwise
into backwash position.
Brine tank will begin to fill.
After 5 minutes, turn actuator until
alternate tank is in backwash.
7
®
tape to ½" nipple on
loading