Commissioning
Combination
electrode Ca 800
General
information
Before measuring
18
Commissioning
1
Remove the storage vessel.
2
Fill ELY/BR/503 bridge electrolyte into the filling opening so that the
inner junctions are covered with bridge electrolyte.
3
Rinse the combination electrode with deionized water.
4
Wipe the shaft using a clean paper towel.
Conditioning, calibration, measurement
When operating the electrode ensure that
the filling opening (1) for the bridge electrolyte is open
the inner junctions (3) are covered with bridge electrolyte
no air bubbles are in the bridge electrolyte
the depth of immersion is within the optimum range:
Minimum depth of immer-
sion
Maximum depth of im-
mersion
1
Condition every ion sensitive electrode in standard solution before
using it.
1
2
3
4
The outer junction (4) must be covered
Approx. 1 cm below the fluid level (2) of the
bridge electrolyte
Ca 800
ba15352d04