GE PVM1790 Instrucciones De Instalación página 22

Homo para colocar encima de la estufa
Ocultar thumbs Ver también para PVM1790:
Idiomas disponibles

Idiomas disponibles

Installation
Instructions
MOUNT THE OVEN (continuedl
[_
Insert a self-aligning screw through top-center
cabinet hole. Temporarily secure the oven by
turning the screw at least two full turns after
the threads have engaged. (It will be completely
tightened later.)
Cabinet Front
Cabinet Bottom Shelf
Filler Block
J_o E
_ This distance
quivaJent
|can
NOT
o depth
| exceed 2" to
f cabinet
/ensurepr°per
_installation
--
Self-Aligning Screw
Oven Top
[_ Insert 3 self-aligning screws
(½"-28 x 2%") through outer
top cabinet holes. Turn two full
turns on each screw.
[]
Tighten the outer two screws to the top of the
oven. (While tightening screws, hold the oven
in place against the wall and the top cabinet.)
II
t
_/
/ /
[_
Install grease filters. See the Owner's Manual
packed with the oven.
IC51 INSTALLING THE CHARCOAL
FILTER
[_
Remove 2 screws on top of oven,just above
the grille panel, using a Phillips screwdriver.
[_
Open the door.
[_
Remove the grille.
Grille
Screws
I
J
f
[_
Insert the filter into the oven us shown until it fits
squarely into place. It will rest at an angle behind
the front lower tabs. When properly installed,
the wire mesh of the filter should be visible
from the front.
Front lower tabs
J
J
Charcoal filter
I_
Replace the grille and the 2 top screws.
[_ Close the door and replace left side screw.
22
loading

Este manual también es adecuado para:

Cvm1790Cvm1750Cvm1750sh2ssCvm1790ss4ss