ABB System proM LSS1/2 Instrucciones De Montaje página 4

Ocultar thumbs Ver también para System proM LSS1/2:
• TECHNICAL DATA
• DATI TECNICI
• TECHNISCHE DATEN
• Power supply: 230 V ±20%
Frequency: 50÷60 Hz
Power consumption: 5VA
Presettable maximum-current range: 5÷90 A
Selection ranges: 5-30; 10-60; 15-90A
Switching on delays: 5-7 min. (Cnp1) ; 4-5.50 min. (Cnp2)
Switching off delay: 2 s
Max. rated current (priority load): 90 A
Terminals size (priority load): 35 mm
Max. rated current (sec. loads): 2 NC, 16 A
(2NO,1A for remote signalling)
Terminals size (sec. loads): 10 mm
Operating temperature: -10‚ +60°C
Stockage temperature: -20‚ +85°C
Signalling of power supply presence: green LED
Signalling of loads switch off: 2 red LED's
Switch off remote signalling: 2 NO contacts
• Tensione ausiliaria: 230V ±20%
Frequenza: 50÷60Hz
Consumo: 5VA
Taratura della corrente d'intervento: 5÷90
Gamme di selezione: 5-30; 10-60; 15-90A
Ritardo inserimento carichi: 5-7 min. (Cnp1); 4-5,50 min. (Cnp2)
Ritardo disinserimento carichi: ~ 2 s
Uscita per carico prioritario: 90A
Morsetto di allacciamento: 35 mm
Uscite per carichi non prioritari: 2 NC, 16A / 2 NA, 1A
Morsetto di allacciamento: 10 mm
Temperatura di funzionamento: -10, +60°C
• DONNEES TECHNIQUES
• DATOS TECNICOS
2
2
2
2
loading