Portfolio 00741 Manual Del Usuario página 4

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
1. Select location near a 120-volt covered GFCI outlet.
Using mounting template (CC), mark holes for
power pack (A) at desired location.
Note: The mounting template must be minimum 12 in.
off the ground level.
Hardware Used
Mounting Template
~I $E==::::::3$fll
X
1
2. Drill holes at depth of about 1.2 in. using 3/16 in.
drill bit (not included). Install anchors (AA) and Phillips
screws (BB), leaving enough space for the power pack
(A) to hang on the the screws.
Note: Do not attach power pack (A) to the wall at this
time.
Hardware Used
~-
~I
Anchor
x2
Phillips Screw
<(\""""' " " ""
ID
x2
3. For low-voltage cable connections, split one end of
the low-voltage cable (not included) approximately
2 in., and strip about 3/4 in. of insulation off each wire.
Twist each side of wire so the copper is not frayed.
Note: Using the correct gauge cable is essential for
obtaining proper lighting performance. For use
with SPT-3, SPT-2, underground low energy
circuit outdoor type cable (Minimum 25 in.
length). See chart:
4
12 in .
2
in.
3/4 in.
Lowes. co m/po rtfol io
loading

Este manual también es adecuado para:

0534700