PRIXTON RUN FIT EVEREST PRO RF300 Instrucciones De Montaje página 19

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
ASSEMBLY INSTRUCTIONS
S3
S2
S1
STEP 1
It is recommended to have a second person assist with this step. Lift both Right and Left
Handlebar Support Tubes up. One person should hold the both Right and Left
Handlebar Support Tubes in place while the other person tightens the bolts.
Lift both Right and Left Handlebar Support Tubes up and align bolt holes. Use two
M8x55 Hexagon Socket Oval Head Bolts (S1) and two M8 Spring Washers (S2) to secure
both Right and Left Handlebar Support Tubes onto the Base Frame.
Use two M8x16 Hexagon Socket Oval Head Bolts (S3) to secure both Right and Left
Handlebar Support Tubes onto the Base Frame .
Semi-tighten all bolts with the Allen Wrench provided.
NOTE: DO NOT FULLY TIGHTEN BOLTS IN STEP 1 UNTIL STEP 2 IS COMPLETED.
19
loading