Makita CBU01 Manual De Instrucciones página 11

Idiomas disponibles

Idiomas disponibles

7.
Insert the plug of the machine into the socket of
the portable power pack.
When inserting, align the triangle marking on both the
plug and the socket.
2
1
► 1. Plug 2. Socket 3. Triangle marking
8.
Press the main power switch to turn on the machine.
The machine is ready to operate. The machine will run
when you pull the switch trigger.
1
► 1. Main power switch
NOTE: You can also use the hanging band as shown in the figure.
Adjust the length of the hanging band as necessary.
3
Blower operation
CAUTION:
ground while it is switched on. Sand or dust may
enter from suction inlet and cause a malfunction or
personal injury.
Hold the machine firmly with a hand and perform the
blowing operation by moving it around slowly. When
blowing around building, big stone or vehicle, direct the
nozzle away from them. When performing an operation
in a corner, start from the corner and then move to wide
area.
11 ENGLISH
Do not place the machine on the
loading