Webasto ProCore Edge 30 Manual De Instalación, Funcionamiento Y Mantenimiento página 4

Ocultar thumbs Ver también para ProCore Edge 30:
Idiomas disponibles

Idiomas disponibles

ProCore Edge 30 North America
Contents
1. Installation, Operation and Maintenance Manual ......... 6
1.1. Scope .......................................................................... 6
1.2 Acronyms, Abbreviations and Symbols ....................... 7
2. Required Tools .................................................................. 9
3. Technical Specifications for 48V and 80V Modules ...... 9
4. Installation........................................................................11
4.1. Installing Multiple Chargers ........................................11
4.2 Installation Precautions .............................................. 13
4.3 Positioning the Charger ............................................ 14
4.4 Wall-Mount Installation ............................................... 15
4.5 Floor Stand Installation .............................................. 16
4.6 AC Power Connection ................................................ 20
AC Service Entrance ........................................................ 23
4.7 DC Battery Connection .............................................. 25
5. Remote Battery Connections (Option) ......................... 31
5.1. Twelve-way (12-way) Screw Terminal Connector ..... 31
Table 1 Bare-Ended Signal Connections ......................... 33
5.2 Optional Features ...................................................... 34
5912995 A01
Webasto Charging Systems, Inc.
4 of 68
IOMM
loading