Kohler Spacity 32160-0 Instrucciones De Instalación página 5

Tocador con patas opcionales
Idiomas disponibles

Idiomas disponibles

2. Install the Hanger
23"
(584 mm)
Mark the centerline of the vanity.
Draw a horizontal line 23" (584 mm) from the floor.
Align the bottom of the hanger with the horizontal line. Verify that the hanger is level.
While holding the hanger in place, drill 1/8" (3 mm) pilot holes through the hanger and into the wall studs or support
behind the finished wall.
Secure the hanger with the provided T30 torx-head screws using the provided T30 torx-head drill bit.
Kohler Co.
1/8" Drill Bit
T30 Torx Head Screw
5
T30 Torx Drill Bit
1533267-2-A
loading