Gessi 57939 Instrucciones De Montaje página 12

Ocultar thumbs Ver también para 57939:
IMPIANTO IDRAULICO - PLUMBING SYSTEM - INSTALLATION HYDRAULIQUE - HYDRAULISCHE ANLAGE -
INSTALACIÓN HIDRÁULICA - ГИДРАВЛИЧЕСКАЯ СИСТЕМА - ΥΔΡΑΥΛΙΚΟ ΣΥΣΤΗΜΑ -
Technical data for the plumbing system:
- Minimum working pressure: 2 bar (200 kPa)
- Working pressure: recommended operating field 3÷4 bar (300÷400 kPa)
- Maximum working pressure: 5 bar (500 kPa) (Install a pressure reducer for higher hydraulic pressures)
- Maximum working temperature: 60°C
- Weight of the empty shower head around 15Kg (with water around 16Kg)
DATA FOR THE DIMENSIONING OF THE SYSTEM AND OF THE BOILER
Minimum supply required for good operation of shower system
STATIC
PRESSURE
2 Bar (200 kPa)
3 Bar (300 kPa)
4 Bar (400 kPa)
5 Bar (500 kPa)
DATA FOR THE DIMENSIONING OF THE SYSTEM AND OF THE BOILER
Minimum supply required for good operation of shower system
STATIC
PRESSURE
2 Bar (200 kPa)
3 Bar (300 kPa)
4 Bar (400 kPa)
5 Bar (500 kPa)
Supply pipes for the shower system: DN 12mm minimum
1
20 l/min
16 l/min
14.5 l/min
14 l/min
DATA FOR THE DIMENSIONING OF THE DRAINAGE
Maximum flow amount with supply pipes DN 12mm [±20%]
19 l/min [with limiter]
Supply pipes for the shower system: DN 12mm minimum
1
20 l/min
16 l/min
14.5 l/min
14 l/min
DATA FOR THE DIMENSIONING OF THE DRAINAGE
Maximum flow amount with supply pipes DN 12mm [±20%]
19 l/min [with limiter]
ART. 57937
ART. 57939
2
20 l/min
16.5 l/min
15 l/min
14.5 l/min
16 l/min [with limiter]
12
水力设备
3
It is not
binding
~ 1 l/min
loading

Este manual también es adecuado para:

57937