Milwaukee M12 FUEL 2565P-20 Manual Del Operador página 18

Ocultar thumbs Ver también para M12 FUEL 2565P-20:
Idiomas disponibles

Idiomas disponibles

WIRING INSTRUCTIONS
2. Seat PCBA in recesses
5. Route cable through this groove
Housing
Connection
Clip
8. Place battery terminal block
firmly and squarely in handle
recess.
Prior to installing the Housing Cover, be sure all elements of the
Electronics Assembly are seated properly (Stator, Main PCBA, Selector
PCBA, On-Off Switch, LED Assembly and Battery Terminal Block
Connector). Be sure the Grounding Terminal is in place and that all wires
are pressed down into all wire traps and channels. Check to assure that
3. Place wires in traps
Switch
Trigger
Fwd/Rev Shuttle
1. HV wire in wire traps
4. Place LED light in recess with the red wire to the top
6. Place switch, forward/reverse shuttle
and trigger in handle support recesses
as shown
LED
PCBAs
wires will not interfere with moving parts. Prior to installing the Housing
Cover, place Forward/Reverse Shuttle onto On-Off Switch and through
Housing Support opening. Check to assure that wires will not be pinched.
Secure the Housing Cover to the Housing Support with five M3 x 16mm
ST T-10 Screws. Be sure to replace the Housing Clip at the bottom of the
battery opening.
HV terminal
7. Be sure that
Rotor Assy.
Stator Assy.
Align HV
terminal
as shown
trigger aligns with
rib as shown
HV Term.
loading

Este manual también es adecuado para:

M12 fuel 2564-20M12 fuel m12 fuel2564-202565-202565p-20