Quasar 6 Control Panel; Initial Startup; Power Supply; Inserting The Rechargeable Battery - Nedo Quasar 6 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 46
4
Structure

Quasar 6 control panel

4.2
1
Switches the Pulse function
2
Consecutively switches the
3
Press 1 x: V
Press 2 x: V
Press 3 x: V
Press 4 x: all off
4
Switches the horizontal
beam on / off.
Lights up red if power supply
5
Lights up red if inadequate.
5

Initial Startup

Quasar 6
When starting the Quasar 6 up for the first time, charge the integrated set of rechargeable
batteries (4.8V / 2x2.4V) to become maximum operating time. Use the charger supplied
(see chapter 6.2).
Important! Only use the charger supplied.
6

Power Supply

6.1
Insert rechargeable batteries
The Quasar 6 green requires 2 NiMH rechargeable battery
packs.
Push together the tabs to the right and left on the battery com-
partment cover.
Pull off battery compartment.
Insert rechargeable battery packs as specified.
Ensure pole direction is correct!
Position battery compartment and push into the unit.
Ensure that both tabs latch into place.
Quasar 6 Operating Instructions
"Pulse function"
button
on / off
LED display
"Pulse function"
Lights up green if "Puls
function" mode activated.
"Vertical" button
four vertical beams on and
switches them all off
together (see chapter 3.1).
+V
1
2
+V
+V
1
2
3
+V
+V
+V
1
2
3
4
"Horizontal" button
LED display
"Rechargeable battery"
is weak.
Power supply.
(See figure)
2
1
4
3
5
-
-
EN
4
17
Tabla de contenido
loading

Este manual también es adecuado para:

460 930

Tabla de contenido