Pfister G89 Serie Manual De Instrucciones página 2

Ocultar thumbs Ver también para G89 Serie:
Idiomas disponibles

Idiomas disponibles

Thank you for purchasing this Pfister product. All Pfister products are carefully engineered, and factory tested to provide long trouble-free use under normal conditions.
This product is easy to install using basic tools and our easy to follow illustrated instructions. If you have any questions regarding your product installation call 1-800-Pfaucet
(1-800-732-8238).
1 BEFORE PROCEEDING
WARNING: Read all the instructions completely before proceeding.
Pfister recommends calling a professional if you are uncertain about installing
this product!
This product should be installed in accordance with all local and state plumbing
and building codes.
WARNING: This product has been designed for use with the Pfister
TX8 series thermostatic valve. It will not work with any other product. Please
review the TX8 valve installation instructions before installing this product.
2 SHUT OFF WATER SUPPLY
Locate water supply inlets and shut off the water supply valves. These are
usually found near the water meter. If you are replacing an existing unit, remove
the old unit and clean the mounting surface thoroughly.
3
3 TOOLS RECOMMENDED
• PTFE plumber's tape or thread sealant
• Slotted screwdriver
• Philips head screwdriver
• Adjustable wrench
• Pipe wrench
• Cloth
Your installation will require a pipe nipple for the spout installation as well
as other additional tools.
4
G
H
J
E
C
K
B
A
4 CHECKING THE CONTENTS OF THE BOX
Upon opening the box, check to ensure that all of the following items are included.
A Gasket & Trim Flange B Washer
D Handle Hub
E Temperature Knob
G Cover Button
H Set Screw
K Diverter Spout
L Shower Arm
N Shower Head
If any of these items are missing, please contact Pfister Consumer Service
at 1-800-Pfaucet (1-800-732-8238).
ENGLISH
• Thermometer
• Flashlight
F
N
L
D
M
C Retainer Sleeve
F Screw
J Hex Wrench
M Shower Flange
INSTALLATION STEPS
5
1
4" Dia. for Thin
Wall Installation
30"
Tub & Shower
Shower Only
5 WORK AREA INSPECTION
Verify that the hole sizes and positions in the wall are correct.
6
A
6B
B
6A
6C
6 PLASTERGUARD OPTIONS
A. For installation using plasterguard, knock out Center Section (6B) from
Plasterguard (6A). The use of plasteguard is optional for standard installations.
B. For installation without plasterguard, remove Screws (6C), and Plasterguard
(6A).
2
1
/
" Dia.
4
3
4
/
" Dia.
4
48"
Tub & Shower
Shower Only
8" Min.
48"
1
1
/
" Dia.
4
6A
30"
loading