ROMMER VCH460BUT Instrucciones De Uso página 41

Idiomas disponibles

Idiomas disponibles

3. INSTALLATION AND PREPARATIONS FOR USE
always use the seals provided in the gas conversion kit. The seals used during connection should
also be approved to be used in gas connections. Do not use plumbing seals for gas connections.
Remember that this appliance is ready to be connected to gas supply in the country for which it has
been produced. The main country of destination is marked on the rear cover of the appliance. If you
need to use it in another country, any of the connections in the figure below can be required. In
such a case, learn the appropriate connection parts and obtain those parts to perform a safe
connection.
Gas Pipe
Seal
Hose
Fitting
Gas Hose
with Collar
It is required to call the authorized service to be able to make the gas connections appropriately
and in compliance with safety standards.
!
ATTENTION! Surely do not use any match or lighter for control of gas leakage.
Gas Pipe
Seal
Adapter
Mechanical
Gas Hose
10
Gas Pipe
Seal
Mechanical
Gas Hose
Gas Pipe
Mechanical
Gas Hose
Figure 7
loading

Productos relacionados para ROMMER VCH460BUT

Este manual también es adecuado para:

Vch460natVch-450 butVch-450 gn