SP6931-2 Workshop 5 Gallon.qxp_SP6931 8/22/16 2:03 PM Page 6
STORAGE RACK ASSEMBLY & MOUNTING
2. Locate wall stud and position the
storage rack so that all four screw
holes are over the stud. Level the rack
and mark the hole locations. Drill a
1/8 inch diameter pilot hole at each
location. Attach the storage rack to wall
studs using the four screws provided.
Make sure all four screws are driven
securely into the wall stud.
3. If the desired location does not align
with a wall stud or the studs are
exposed, a 1/2 inch thick plywood
panel wide enough to span at least
two studs, must be attached to the
studs with the four screws provided.
The storage rack may then be attached
to the plywood panel with four 1 inch
#10 pan or round head wood screws
(not provided).
NOTE: Supplied wood screws are
intended for mounting to typical wall
construction consisting of 5/8 inch
drywall or less.
CAUTION: To prevent plywood,
Storage Rack, or Wet/Dry Vac from
falling, make sure you have selected
the proper length of fastener for the
secure mounting of storage rack to
the wall.
WARNING: To reduce the risk of
fire or electric shock, do not leave
Vac plugged in when not in use.
Do not leave Vac running while
unattended.
(continued)
6
Storage Rack
Screw (4)