Insert the fitting into the main pipe and carry out the welding. If necessary,
turn the spindle to improve alignment.
At the end of the cooling, loose both pipe and fitting.
CONTRUCTION OF MULTI-BRANCH PIPE LINE
In the example below the outlet-sockets are on the same plane:
The welds can also be carried out on pipes with the longitudinal axis not
level.
Use the framing bracket to align the bores to be made on the same plane.
Proceed with drilling the main pipe and welding the fittings.
The framing-bracket also allows you to weld fittings on the pipe-sides as
depicted below: