4. Live/load wire
5. Traveler 1 wire
6. Traveler 2 wire
7. Neutral wire
8. Ground wire
4
BOX
5
Traveler(T1 or T2)
Traveler(T1 or T2)
6
Load Wire
4
Load Wire
Ground Wire
Neutral Wire
Initial inspection
Before installing the electrical xture, ensure that all parts
are included in the package. If any part is missing or
damaged, do not attempt to assemble, install, or operate
this product.
Estimated installation time: about 30 minutes.
Tools that may be required but are not included for
8
installation
7
1. Phillips screwdriver
2. Flathead screwdriver
3. Pliers
4. Wire strippers/cutters
5. Circuit tester
6. Work gloves
7. Electrical tape
8. Safety goggles
1
2
3
4
5
6
7
8