Ruby AFC-9001 Manual De Instrucciones página 56

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
OPERATION INTRODUCTION
Before starting operations in this section:
1. Find a place where there is power supply nearby.
2. As shown in Fig.2 and Fig.2a, install the exhaust hose, and adjust the window position well.
3. As shown in Fig. 6, connect drain hose well (only for using heating model);
4. Insert the power cord into an grounded AC220~240V/50Hz socket;
5. Press the POWER button to turn on the air-conditioner.
1.Before using
Notice:
• Operation temperature range:
DB/WB(ºC)
DB/WB(ºC)
Check up whether the exhaust hose has been mounted properly.
Cautions for cooling and dehumidifying operations:
• When using functions on cooling and dehumidifying, keep an interval of at least 3 minutes between
each POWER.
• Power supply meets the requirements..
Fig. 2
Maximum cooling
35/24
Maximum heating
27/---
Fig. 2.a
57
Minimum cooling
18/12
Minimum heating
7/---
loading