Kohler K-15889 Guia De Instalacion página 5

Ocultar thumbs Ver también para K-15889:
Idiomas disponibles

Idiomas disponibles

Faucet Shank
Nut
Supply
Tube
Supply Stop
4. Supply Installation
For ground joint connections:
Slip the nut onto the supply tube.
Position the round end of the supply tube squarely to the inlet of
the faucet shank and supply stop.
Securely tighten all nuts.
5. Checkout Installation
Ensure that both faucet handles are turned off. Hot is clockwise
close and cold is counterclockwise close.
Turn on the hot and cold water supplies.
Check for leaks.
Remove the aerator by turning it counterclockwise.
Turn on the hot and cold faucet handles for one minute to flush
debris from the faucet.
Close the hot and cold water handles.
Reattach the aerator by turning it clockwise until hand tight.
Kohler Co.
Aerator
5
112897-2-AB
loading