Parkside PDS 30 A1 Instrucciones De Uso página 7

Ocultar thumbs Ver también para PDS 30 A1:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 60
Parts and operating components
(See fold-out page for illustrations)
The ceiling prop PDS 30 A1 consists of the following parts:
Rubber pad
Upper bar
Pump lever
Lower bar
Locking screw
Tube
Locking bolt
Locking lever
Usage
Loosen the locking screw
If necessary, press the two locking bolts
pull the lower bar
is located under the load to be supported (Fig. C).
Allow the two locking bolts
Use the red line which marks the position of the locking bolts
on the lower bar
If the length of the lower bar
upwards (Fig. E) and pull the upper bar
Re-tighten the locking screw
To make fine adjustments to the height, press the pump lever
until the rubber pad
(Fig. G).
To loosen and remove the prop, press the locking lever
upper bar
Loosen the locking screw
Hold the tube
out of their detent (Fig. B).
Push the lower bar
4 
GB │ IE
1
2
3
4
5
6
7
8
5
4
out up to the required height until the rubber pad
4
as an orientation aid.
1
is located firmly under the load to be supported
2
has been completely retracted (Fig. H).
5
6
firmly with one hand and press the engaged locking bolts
4
back inside completely.
(Fig. A).
7
out of their detent (Fig. B) and
7
to engage completely in the tube
4
is insufficient, push the locking lever
2
out to the required height.
5
(Fig. F).
(Fig. A).
1
6
detent.
7
(Fig. D)
8
3
several times
8
upwards until the
7
PDS 30 A1
loading