Sagi KP12G1M Instrucciones Originales página 79

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 96
INSTALLATION
The units are always shipped on pallets and protected by cardboard boxes.
On receiving and after having unpacked in case of dammages or missing pieces act as
described in the chapter "GENERAL NOTES BY THE DELIVERY".
All setting up and starting operations are to be carried out by skilled staff.
WARNING: package parts (plastic bags, polystyrene foam, nails and the like) are
dangerous for children and must not be left within their reach.
Lift the unit with a forklift and move it to its place of installation paying
close attention that the load is well balanced.
WARNING: overturning hazard: Never tilt the unit. During handling
make sure that it is stabilised by qualified personnel.
WARNING: never transport the unit in a horizontal position; such an
operation could cause damage to the structure and or to the operational
plant.
WARNING: this appliance must not be installed in rooms with a volume lower than
30 m³.
Once on the installation site, proceed as follows.
Remove the packing box, adhesive tape
and any styrofoam pieces.
Remove the two screws at the rear.
Remove the two strips of wood at the base of the packaging.
With a forklift, lift the appliance, freeing it from the package base and bring it to the installation
location, making sure that the load is balanced. Place the unit in its permanent location.
9
loading

Productos relacionados para Sagi KP12G1M

Este manual también es adecuado para:

Kp12g2mP12g1mP12g2m