Preparation For Operation - Steinberg Systems SBS-MD-20 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 99
3.2.

Preparation for operation

ASSEMBLY OF THE UNIT
1. Open the package and remove all components.
2. Connect the detector's probe (1) to the lower stem (4) and then tighten the
probe fixing screw (2).
2. Press the lock on the lower stem (7) and slide it into the middle stem (6). The
lock must be visible in one of the holes (9).
3. Press the lock in the middle stem (7) and slide it into the upper stem (12). The
lock must be visible in one of the holes (9).
4. Adjust the length of the stem so that you can comfortably stand upright
holding the detector with the probe parallel to the ground. The other arm
should be relaxed, placed freely along the body. Tighten the locking nut on the
middle stem (5) counterclockwise.
5. Attach control panel (10) to upper stem (12) and tighten control panel
mounting screws (11) securely.
6. Wrap the cable around the stem and insert the cable plug into the 5-pin socket
(on the back of the control panel).
7. Check that the stem length is correct. Stand upright holding the detector with
the probe parallel to the ground at a height of 1-5 cm. The other arm should
be relaxed, placed freely along the body. Tighten the locking nut on the upper
stem (8) in a counter-clockwise direction.
CAUTION!
bolts!
CAUTION!
orientation. Do not force the plug or pull the cable - damage may result.
INSTALLING BATTERIES (batteries not included):
1. Turn off the unit before installing the batteries.
Do not use excessive force or tools to tighten the clamping nuts and
The cable plug must be placed in the socket in the correct
Tabla de contenido
loading

Tabla de contenido