Before Installation
Safety Requirements
Be sure to preview the standard operating procedures (SOP) and ensure local building and elec-
trical codes are reviewed before installing the DC Wallbox charger.
The DC Wallbox charger should be installed by a qualified technician according to the instruction
manual and local safety regulations.
Use appropriate protection when connecting to the main power distribution cable.
Disconnect switch for each ungrounded conductor of ac input shall be provided by others in
accordance with the IEC61851-1.
For three-phase four-wire 380Vac-415Vac input, type C or D breaker with type A 4-pole 30mA
RCD in the upstream panel should be installed, and the rating current of the breaker should be
50A.
For three-phase three-wire 200Vac-230Vac input, type C or D breaker with type A 3-pole 30mA
RCD in the upstream panel should be installed, and the rating current of the breaker should be
100A.
Accessory Kit
Mounting bracket x 1
User manual x 1
Bag of bracket screws
x 2
(SCREW M M6*1*8
PAN TORX SUS NL)
Installation and Operation Manual
U P
Mounting template x 1
CCS2 plug holder x 1
Bag of grounding
screw x 1
(SCREW M M6*1*12
HEXH C S+P S20C
ZN-NI)
RFID cards x 2
CHAdeMO plug holder
x 1 (dual output model
only)
Bag of expansion bolts
x 6 (+2 for dual output
model)
(ANCHOR SUS
16*50.8 PICKLING)
6
Before Installation
Keys x 2
Cable Gland x 1