Harness User's manual | PIXAIR 2
- Secure the installation by pushing the right side of the yellow cable
through the loop cord «1» then, the sleeve.
- Secure the installation by pushing the left side of the yellow cable
through the loop cord «5» then, the sleeve.
- Carefully remove the line.
-
Insert the ends of the handle in their respective protective housings
and
.
B
1
6
B
INSTALLING THE RESERVE PARACHUTE
Locking the reserve parachute handle.
4
A
B
A
Mandatory extraction test procedure
Check the completed
installation during a
A
Have the installation checked by a professional outfit.
Conduct an extraction test every six ( 6 ) months to assure proper
system functionality.
Note : conducting and extraction test does not imply deploying the
reserve parachute which will stay inside its POD.
hang-test.
PIXAIR 2 | page 20