Espa Leader 8G Manual De Instrucciones página 8

Ocultar thumbs Ver también para 8G:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

USER GUIDE
EN
6.2 Chlorinator maintenance
6.2.1 Maintenance of the electrolysis cell
In order to ensure optimum performance of the chlorinator, the electrolysis cell must be tested
every 3 months, after cleaning the filter. Follow the steps below:
1. Before removing the electrolysis cell, close the inlet valve and keep off
chlorinator for at least 5-10 minutes.
2. After removing the electrolysis cell, make sure that no sediment remains, and wash it off
with water.
3. If there is lime in the titanium cell, it should be immersed in 4: 1 parts of hydrochloric acid,
and rubbed gently. For safety, wear rubber gloves and eye protection.
4. If there is sediment of a larger nature, contact the dealer.
7. REPAIR
You can directly manage your repairs at: www.ser20sp.com
* Check warranty and repair conditions directly on the website.
8
Tabla de contenido
loading

Este manual también es adecuado para:

12g16g20g

Tabla de contenido