Installation; Installing The Electrode Arm (Optional El30); Installing The Batteries (Fg3) - Mettler Toledo Education Line EL30 Instrucciones De Manejo

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53

Installation

3.
Installation
Carefully unpack the meter. Keep the calibration certificate in a safe place.
Insert the right adapter clip into the power adapter slot:
3.1

Installing the electrode arm (optional EL30)

The electrode arm can be fastened to EL30 on the left or the right side.
. Remove the electrode stand rubber cover on that side of the bench meter where you prefer the stand.
Keep the cover in a safe place;
2. Insert the electrode stand firmly into the opening as shown;
3. Fix the opening of the arm upon the stand from above, adjust it to a moderate height.
3.2

Installing the batteries (FG3)

4
Five_cond_edu.indb 4
All manuals and user guides at all-guides.com
METTLER TOLEDO Education Line conductivity meter
Mini DIN
13.03.2007 16:28:04
Tabla de contenido
loading

Este manual también es adecuado para:

Education line el3

Tabla de contenido