Setup The Ups; Communication Port - Digitus DN-170093 Guía Rápida De Instalación

Sistema sai online
Ocultar thumbs Ver también para DN-170093:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
• Rackmount converted to tower installation
(1) Two plastic base brackets
(2) Flatten it after intercrossing
Intercross as following figure:

2.4 Setup the UPS

Step 1: UPS input connection
Plug the UPS into a two-pole, three-wire, grounded receptacle only. Avoid using
extension cords.
• For 208/220/230/240VAC models: The power cord is supplied in the UPS package
Step 2: UPS output connection
• For socket-type outputs, simply connect devices to the outlets.
• For terminal-type input or outputs, please follow below steps for the wiring
configuration:
a) Remove the small cover of the terminal block
b) Suggest using AWG14 or 2.1mm2 power cords for 3KVA
(208/220/230/240VAC models).
c) Upon completion of the wiring configuration, please check whether the wires
are securely affixed.
d) Put the small cover back to the rear panel.
Step 3: Communication connection
To allow for unattended UPS shutdown/start-up and status monitoring, connect the
communication cable one end to the USB/RS-232 port and the other to the
communication port of your PC. With the monitoring software installed, you can
schedule UPS shutdown/start-up and monitor UPS status through PC.

Communication port

5
Tabla de contenido
loading

Este manual también es adecuado para:

Dn-170094Dn-170095Dn-170096

Tabla de contenido