2 kVA:
3 kVA:
(1) Output receptacles (10 A)
(2) Battery terminal
(3) SNMP intelligent slot (option)
(4) Network/Fax/Modem
Surge Protection (option)
(5) RS-232 communication port
2.3 Installing the UPS
• Rackmount installation
The Rackmount cabinet comes with all of the hardware required for installation in a
standard EIA or JIS seismic Rackmount configuration with square and round
mounting holes.
The cabinet is heavy. Removing the cabinet from its carton requires a
minimum of two people.
If installing optional EBP(S), make sure to install the EBP(S)
directlybelow the UPS so that all wiring between the cabinets is
installed behind the front covers and inaccessible to users.
Note: Mounting rails are required for each individual cabinet.
(6) AC input receptacle
(7) Input circuit breaker
(8) EPO (option)
(9) USB (option)
(10) Output receptacle (16 A)
CAUTION
4