®
Sistemi Elettronici
di Apertura Porte e Cancelli
International registered trademark n. 804888
MANUAL RELEASE SYSTEM
WARNING: Always switch off the main power (110V or 230V) before servicing the operator.
Fig. 24
WARNING: SEA recommends to the end user to release the operator only after having switched off the electric power.
Always contact a professional installer in case of not correct working of the operator.
1) Check the solidity and the stability of the gate, especially the points of support and/or rotation of
the gate (pivots).
2) Check the oil level of the hydraulic/in oil bath operators (cap on rear cover of the Full Tank)
3) Change the hydraulic oil with the one recommended from the head company
4) Check the release function
5) Check the by-pass valves function
6) Check and lubricate the fixing pins
7) Check the integrity of the connection cables
8) Check the function and the positive stops condition in opening and closing (where there is
present a mechanical positive stop accessory)
9) Check the good status of all parts which are forced (rear bracket, oscillating bracket and front
bracket).
10) Check the operating of all accessories, especially the function of all safety devices and of the
Safety Gate.
11) Lubricate with grease SEA (GREASE GL 00 65000009)
12) After having executed the periodical maintenance operations it is necessary to repeat the
test and the putting in service of the automation
All the above described operations MUST be made exclusively by an authorized installer.
Cod. 67410845
To the attention of users and technicians
To release, open the lid, insert the
key, rotate starting from the stop of
departure from ½ turn to a
maximum of 1 turn (360°) in anti-
clockwise direction (see fig.24).
To re-lock, turn the key into
c l o c k w i s e d i r e c t i o n t o t h e
maximum, afterwards bring back
the key into the position 0, turn it
again in anti-clockwise direction
(see fig. 25), remove the key and
close the little door again.
Attention: Turning the key over 1
turn (360°) could damage the
release .
PERIODICAL MAINTENANCE
REV 04 - 11/2010
FULL TANK
English
English
0
Fig. 25
Annual
Annual
4 years
Annual
Annual
Annual
Annual
Annual
Annual
Annual
Annual
Annual
25