Tabla de contenido
H y b r i g e n e O P E R A T O R ' S M A N U A L

Installation

1
Place the unit on a suitable bench, a flat workspace, or in a safety cupboard if
required, ensuring that the air inlet and outlet louvres are not obstructed.
2
Insert some liquid into a tube and place the tube in the Hybrigene. Adjust the feet
by unscrewing them anticlockwise slightly until the unit is level. Check the level by
putting the tube in different positions.
3
Plug the mains cable into the socket on the rear of the unit.
12
Back of the Hybrigene
Fuse Drawer
Fuse Rating Label
Power Switch
Power Socket
Rating Plate
Holes for
Stacking Plates
and
Wall Brackets
Tabla de contenido
loading

Tabla de contenido